May Thru December

Pretty hard to take pictures during this period. The sheeting boards where nailed on - and I couldn't get up on the roof to take pictures. The cripple walls in the attic went in, and the shingles were started, and completed on the south side. 11 Dec 2003, the shingles for the north half were delivered (the pile is for future roofing of the garage). With the sheeting boards in, and some of the shingles on, we are finally without leaks during the rain.

20030824a.jpg (86kb) 20030824b.jpg (77kb) 20030824c.jpg (82kb) 20030824d.jpg (76kb)
20030824e.jpg (75kb) 20030824f.jpg (58kb) 20030824i.jpg (57kb) 20030824g.jpg (71kb)
20030824h.jpg (65kb) 20030901gableend.jpg (69kb) 20030924fuzzy.jpg (77kb) 20031114shingles1.jpg (96kb)
20031114shingles2.jpg (88kb) 20031114shingles3.jpg (91kb) 20031114shingles4.jpg (97kb) 20031114shingles5.jpg (96kb)
20031211-09.JPG (90kb) 20031211-10.JPG (75kb) 20031211-11.JPG (66kb) 20031211-12.JPG (64kb)
20031211-13.JPG (65kb) 20031211-14.JPG (62kb) 20031211-15.JPG (62kb) 20031211-16.JPG (41kb)
20031211-17.JPG (41kb) 20031211-18.JPG (79kb) 20031211-19.JPG (91kb) 20031211-20.JPG (69kb)
20031211-21.JPG (101kb) 20031211-22.JPG (95kb)